Frequently Asked Questions
Straight answers on chargers, installation, power, rules, safety, subsidy, software and hosting.
Chargers · Installation and power · Software and operations · Rules and safety · Subsidy and certification · Hosting
Questions about chargers
What is an EV charging station?
Equipment that charges an electric vehicle’s battery, from an AC wall unit to a DC fast charger. It includes the charger, a power connection and often software for monitoring, access and billing.
What is the difference between AC and DC charging?
AC charging uses the vehicle’s onboard charger and is slower, suited to long parking. DC fast charging feeds the battery directly, for short stops. CCS2 is the common DC connector for cars, Type 2 for AC.
Can I choose the charger capacity?
Yes, within your supply. Typical AC chargers are 3.3 to 22 kW. Typical DC fast chargers are 30 to 120 kW, and high-power units go higher where sanctioned load allows. We check your load and DISCOM position first.
Can charging stations support multiple EV brands?
Yes. Chargers with standard connectors work across brands. CCS2 for DC and Type 2 for AC cover most cars sold in India today. We choose chargers for your site and the vehicles you expect.
Questions about installation and power
How much does an EV charger installation cost?
It depends on the charger type and capacity, cable distance from your panel, civil work, any power connection upgrade and the software setup. Because these vary, we do not quote upfront. A site assessment gives a written estimate.
What power connection is required?
It depends on charger type and number. AC charging often runs on an existing connection with enough sanctioned load. DC fast and high-power charging usually need more sanctioned load and DISCOM approval, sometimes a dedicated connection.
How long does installation take?
It depends on your power connection and approvals, not the charger. AC on an existing connection with enough sanctioned load is quickest. A load enhancement, new DISCOM connection or civil work takes longer. We confirm the schedule after the assessment.
Can a charging station be expanded later?
Yes. Many sites start with one or two points and add more as demand grows. Planning cable routes, panel capacity and load headroom at the start makes expansion simpler.
Questions about software and operations
Can FluxPoint provide software?
Yes. We provide, configure and operate the charging software: monitoring, sessions, access, prices, payments, reports and alerts. You need no separate software or vendor.
How does CPO work?
A Charge Point Operator (CPO) runs charging stations day to day: status, access, sessions, prices, payments, reports and maintenance. We act as your CPO, operating stations remotely on OCPP-based software.
What maintenance is required?
Periodic checks of hardware, cabling, connectors and safety devices, plus software updates and fault monitoring. We handle field maintenance, and remote monitoring catches problems early.
Questions about rules and safety
Answers cite the Ministry of Power guidelines of 2024 and the CEA safety regulations of 2023. Local practice varies, so we confirm each point for your site.
Do I need a licence to run an EV charging station?
No. The Ministry of Power guidelines of 2024 make it a de-licensed activity: any entity may set up and run a station by following them. You still need a power connection, safety compliance before switch-on and local permissions.
How long does the electricity connection take?
The 2024 guidelines give DISCOMs time limits after a complete application: 3 days in metropolitan areas and 7 in other municipal areas. Rural areas get 15 and hilly rural areas 30. Actual timelines vary by DISCOM.
What if my site needs a line extension or a new substation?
The guidelines allow up to 90 days where a line extension or new substation is needed. We confirm the local timeline with your DISCOM.
Can a fast charger run on a low-tension connection?
Often. Under the guidelines, DISCOMs must give charging stations a separate low-tension connection of up to 150 kW on request. That covers most sites with one or two DC fast chargers. Your load and local network still decide.
What will electricity cost for charging?
Under the 2024 guidelines, supply to charging stations has a single-part tariff. Until 31 March 2028 it should not exceed the DISCOM’s average cost of supply. Your state’s tariff order sets the actual rate, so we check it.
Is charging electricity cheaper at some hours?
Yes. Under the same guidelines the tariff is lower between 9 am and 4 pm and higher at other hours.
Is there a limit on what I can charge drivers?
Yes. The guidelines cap the service charge, the amount added to the electricity cost. AC and DC have separate ceilings, which run until 31 March 2028 and apply on public or private land. See the figures on business models.
What safety rules apply to a charging station?
The Central Electricity Authority safety regulations of 2023 have a chapter on EV charging. It covers protective earthing with earth continuity monitoring, protection that cuts supply on a fault, lightning protection, fire-retardant enclosures, and fire detection and alarm.
What checks and records are needed after installation?
The CEA regulations require the owner to have the charger maker’s specified tests done and to keep station records for at least seven years. Our maintenance handles both. Installations are also inspected or self-certified at least every five years.
Can chargers be installed in a basement or covered car park?
It depends on local fire and building rules, which differ between cities. Some ask for added fire safety measures or a no-objection certificate. We check the local requirement in the site assessment and design to it before work starts.
Can residents of a housing society install their own chargers?
Yes. Under the 2024 guidelines a resident can install a private charger in their designated parking space. Supply can come through their existing meter or a separate sub-meter, as they choose. Bye-laws and the DISCOM’s process still apply.
Can a society install shared chargers?
Yes. A society can take a separate metered connection for shared chargers. We work with the managing committee.
Do I have to list my station anywhere?
The guidelines expect public station operators to register on the Bureau of Energy Efficiency’s national online database. We do this for public stations we operate. Private chargers only for residents, staff or fleets are not public stations.
Questions about subsidy and certification
Is there a government subsidy for EV chargers?
Not one a private owner can claim directly from the centre. FAME II ended on 31 March 2024. PM E-DRIVE, the current central scheme, runs to 31 March 2028 and funds public charging through central and state government bodies.
Will you count a subsidy in my numbers?
Only if it is confirmed in writing. Otherwise we never build a subsidy into your numbers.
Can my site benefit from PM E-DRIVE at all?
Only through a government body. Ministries, public sector companies, states and their nodal agencies apply, and may engage a private operator. At locations such as streets, malls and market complexes, support covers upstream electrical work, not the charger.
Do states offer their own incentives?
Some state EV policies support public charging stations or offer a special electricity tariff for charging. Terms, limits and dates change, and many schemes close when funds run out. We check your state’s current notification and show you the source.
What certification should a charger have?
Indian standard IS 17017 covers chargers: Part 1 general requirements, Part 2 plugs and connectors, Part 23 DC chargers. Ask for the exact model’s test report, not a general claim. Every charger we supply comes with its test documents.
Which connector standards should I ask for?
For cars, CCS2 for DC fast and Type 2 for AC. Both are defined under IS 17017 Part 2, and the central scheme guidelines list connectors by it. Two and three wheelers use light EV connectors.
Why does OCPP matter when choosing a charger?
OCPP is the open charger-to-software protocol. Supporting chargers can be run remotely and switched to other software without new hardware. The 2024 guidelines advise public operators to adopt open communication standards. All networked chargers we supply support OCPP.
Questions about hosting and partnership
Can I host an EV charging station?
Yes, if your property has suitable parking, an adequate or upgradable power connection and the right approvals. Owners, businesses, workplaces and community associations can all host. A site assessment confirms feasibility before you commit. See hosting.
Can businesses generate revenue from EV charging?
It depends on how you run it. Charging can be free, at cost or paid, at prices you set. Whether it covers costs or earns more depends on use, prices and your power cost. We do not promise earnings.
Still have a question about your site
The answers above are general. Tell us about your site for specifics.