One Partner. From Site to Charging Network.
One accountable partner for your EV charging station installation, from site check to daily running.
How we deliver
Plan
We assess your site’s power, layout and expected use.
Install
We supply the chargers, wire them in and test before handover.
Operate
We monitor, maintain and run the station across its working life.
What each stage includes
Site Assessment and Planning
We check power, layout and growth room before recommending anything.
Charger Selection
We match the charger to your site, not a catalogue.
Installation and Testing
We wire, mount and test every charger before handover.
Operations and Monitoring
We track charger status and usage once it is live.
Maintenance and Support
We run scheduled checks and manage faults to resolution.
What is included at each stage
Site assessment and planning
- Available power, your approved power limit and headroom for new chargers
- Parking layout, traffic flow and likely charging demand
- Panel distance, wiring capacity and room to expand later
- A written recommendation on charger type, count, placement and commercial viability
Charger selection
- Matched to your approved power limit, dwell time and vehicle mix
- AC, DC fast and high-power options, not one fixed capacity
- Built on OCPP, the open charging standard, so you can add capacity later
Installation and testing
- Electrical and civil work to bring power to the charger
- Mounting, wiring and setup for your network and prices
- Testing and switch-on, then a documented handover confirming it is ready
Operations and monitoring
- Charger status and availability tracked so issues surface early
- Faults managed through to resolution
- Session and consumption reporting, from our charging platform
Maintenance and support
- Scheduled checks catch wear before it causes downtime
- Fault alerts narrow down what a site visit needs to fix
- Breakdown visits arranged and tracked through to close
- Firmware and software kept current, with charger health tracked over time
Questions we hear
How long does an EV charging station installation take?
It depends on your power connection and approvals. An AC installation on an existing approved power limit is usually quicker. A DC fast charger or a new power connection takes longer, since it needs more electrical work and DISCOM approval.
What power connection do I need?
It depends on the charger type and count you choose. AC chargers can often work within an existing commercial connection. DC fast and high-power chargers usually need a higher approved power limit, which we confirm during the site assessment.
Who handles the DISCOM paperwork?
We assist with and coordinate the DISCOM paperwork for your site as part of the electrical planning. Approval itself rests with the DISCOM, and timelines depend on their process.
What drives installation cost?
It depends on the charger, the electrical and civil work, and whether your approved power limit needs an upgrade. We set this out in the written recommendation after the site assessment.
Ready to Start Your Charging Network
Whether you are planning your first charger or building out a network, one team can take it from site assessment to daily operations.